DLH200 Tube fabric vertical Dryer

Font size: [Big] [Normal] [Small]
3, the machine structure
      3.1 rack part
         Frame established by the left and right panels, the connection stays, pedal, escalator, panels and other components.
      3.2 of cloth and the mercy of the system
         Into the fabric by the guide roll, the cloth guide roller, arm, arm shaft, the arm of the roller, drive motor and other components.
      3.3 Heat
By the heat pipe, wind pipe, set the wind pipe, radiator, fan, valve, filter, trap and so on.
      3.4 Electrical System
         By the electrical boxes and other components.
4, installation and adjustment
      4.1 Rack installation
     The left and right side of the panel lying on the ground up, install the connection on hold, pedals, cloth roller, the mercy of institutions, and then force it upright.(Cloth roller, the mercy of institutions can be put in the rack after installation)
      4.2 Hot air system installation
The guide duct into the rack so that the two vent holes through the panel. In order to connect set outlet, radiator, fan. Took the filter inlet port, valve, then the outlet trap.
    4.3 Electrical Installation
Electrical equipment cabinet on the side, according to the electrical schematics, electrical wiring diagram circuits connected NOTE electrical wiring has been completed, must use 500-volt megger test set shortage of parts of the insulation resistance should not be less than indicated value0.5 MO.
5, operation of operational safety issues
     A, ensure that the escalator fixation.
     B, to ensure that the pedal firmly fixed.
5.1 Preparation
5.1.1 power QF, QF1, QF2, QF3, QF4 power indicator light, press QF5, QF6, ? ? air motor running, adjust the speed control knob clockwise, so that mechanical and electrical surface wind speed 1000r/min, check the pipelinewhether there is leakage around the phenomenon.
5.1.2 Press the Forward button, the drive motor is running, adjust the main speed dial, the speed is set to 5m/min, equipment began at low speed. Checking into and out of the steering roller, upper and lower layers should roll steeringOn the contrary.
                   5.1.3 Unscrew the valve cut-off switch, check the heating situation.
                   5.1.4 Turn off all switches.
                   5.1.5 cloth ready for testing.
5.2 driving job
5.2.1 Switch all power switches, press the button to open the fan, unscrew the switch to open-ended, began warming up, adjust the size of the opening of the throttle to adjust the speed of the heat pipe.
5.2.2 When the temperature rises, it begins on the cloth. Cloth through the cloth guide ring on the roller into the heat pipe, depending on the cloth into the cloth drying effect of adjusting the speed.
5.2.3 into the cloth after the end of the cloth from the roll of cloth exported, according to the cloth drying effect the speed of adjustment of the cloth to ensure that the Bu Houbu drying.
                    5.3 Shutdown
                    5.3.1 Press the Stop button, the drive motor off.
                    5.3.2 Close valve switch, sending steam off.
5.3.3 When the radiator temperature dropped to below 80 ?, press the stop button the fan ? ?.TA3, TA4 ? ? fan stopped working.
                    6, maintenance and precautions
6.1 The equipment operator is not prohibited to operate this equipment, the new operator must read the manual and try to operate behind the operational proficiency of the equipment.
6.2 attention away from radiators, heat pipes and other components, so as not to burn.
6.3 Note that the transmission components, not touching any part of the body, in order to avoid accidents.
6.4 up and down the escalator should be careful not to slip injury.
6.5 throughout the chain, seat-bearing grease should be once a month. The chain use 90 # machine oil, Bearings with calcium-based grease.
6.6 To ensure security, should ensure that all devices are powered down, the equipment for maintenance cleaning.

Copyright: Shandong Taida Dyeing&Finishing Machinery Co.,Ltd 2011-2012 AllRights Reserved.
Address: LingXian Economic Development Zone,Nan Huan Road NO.7
Url: http://www.dlhtbz.com/En/ Technical support: AdminBin
Ļ <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <֩>| <ı> <ı> <ı> <ı> <ı> <ı>